South Lake Worth Inlet

 

South Lake Worth Inlet Project Grand Opening
Thursday June 16th at 10:00am

SOUTH LAKE WORTH INLET PROJECTS

Sand Transfer Plant Construction
Bird Island Seawall Construction
North and South Jetty Rehabilitation

South Lake Worth Inlet History

  • Also referred to as the Boynton Inlet.
  • Created in 1925 to “flush” the Lake Worth Lagoon.
  • The sand transfer plant installed in 1937 was the first of its kind in the nation.
  • The original plant was replaced in 1967.
  • Extension of the north jetty was completed in 1967.
  • Bird Island (once known as "Beer Can Island") located within the inlet was restored in 1996.
  • Historical Account of the South Lake Worth InletAdobe PDF Document

Project Location

The Problem

  • The old sand transfer plant was structurally unsound and losing efficiency.
  • The jetty crib structures and deck were damaged beyond repair.
  • The seawall on the south side of Bird Island was failing.

The Solution-Beginning in 2009

  • Build a new sand transfer plant.
  • Build new crib structures and decks over the existing north and south jetties
  • Build a new seawall in front of the existing seawall at Bird Island.

Additional Information

 

What's New

 
  • Call for Presentations for FLERA's 2012 Conference.
  • See the latest edition of Environmental Times, Spring 2012 ![PDF]
  • The numbers are in! See what ERM Volunteers Accomplished in 2011.[PDF]
  • ERM launches "Explore a County Natural Area" at your local library.
  • Memorial Benches can now be donated for placement in PBC Natural Areas.[PDF]
  • Online Ibis Isle Restoration Project Slide Show with Audio [PDF/5 MB/5 minutes]
  • Stay up to date with the Department's Monthly Status Reports. [PDF]